High Efficient Polyurethane Casting Machine for Decorative PU Foam Cornice
Certification:CE,FCC,MSDS
High Efficient Polyurethane Casting Machine for Decorative PU Foam Cornice
Main Technical Parameters:
|
No. |
Item |
Technical Parameter |
|
1 |
Foam Application |
Flexible Foam |
|
2 |
Raw Material Viscosity (22℃) |
POLY ~2500MPas ISO ~1000MPas |
|
3 |
Injection Pressure |
10-20Mpa (adjustable) |
|
4 |
Output (mixing ratio 1:1) |
90~450kg/min |
|
5 |
Mixing Ratio Range |
1:5~5:1(adjustable) |
|
6 |
Injection Time |
0.5~99.99S (correct to 0.01S) |
|
7 |
Material Temp Control |
±2℃ |
|
8 |
Repeat Injection Accuracy |
±1% |
|
9 |
Hydraulic System Output: |
10L/min |
|
10 |
Tank Volume |
500L |
|
11 |
Compressed Air Needed |
600NL/min |
|
12 |
Temperature Control System |
Heat: 2×9Kw |
|
13 |
Input Power |
three-phase five-wire 380V |
Electrical control system
1. Fully controlled by PLC system
2. Large PCL touch screen computer. Figures of temperature, pressure, rotation speed are
all displaying in the color screen.
3. Alarm function with acoustic warning.
Equipment Introduction
1. Two day tanks for Raw Material A(Pol) and B(ISO). Tanks can be added according to your
componenets. If your products needs colorant, then three day tanks can be realized.
2. Employing PLC central control system, Automatic calibrate metering pump, real time data saving and
inquiry, bilingual language program displaying corresponding values for temperature, pressure,
rotation speed, and proportion.
3. Mixture head\'s main shaft can reach 8600 r/min, saving raw material and production costs,
reducing wash times, improving production effiency and ensuring products quality.
4.Tank adopts double layers for temperature insulation, which ensures raw materials in your
expected temperature, saving energy and electric;
5. Material hoses and pipelines are employing Thermal conductive insulation layers for ideal
temmperature for materials circulation, realizing the raw materials have constant temperature
during conveying process.
PU Foam Injection Machine for Decorative PU Foam Cornice in Our Workshop:
FAQ:
1. How long will your engineer reach our factory?
Within one week after the machine arrived at your factory.
2. How many days will you finish installing?
For low pressure and high pressure injection machines, 10 days will be enough for our technicians to
complete the equipment installation, erection, start-up commissioning and personnel training.
For PU molding machine, mold carriers, and sandwich panel production lines, 25 to 30 days are
necessary for our technician to complete the assembly, installation, erection, start-up commissioning
and personnel training.
3. What would be charged for your engineers to install and train our people at oversea plant?
Usually are the costs invoving in the asigned ngineer\'s visa, air tickets, acommodations,
and their salary. It is our policy to charge USD 150 per capita per day.
4. How long is your machine\'s warranty period?
All our machines are with one year guarantee, starting from the date of completing the commissioning.
5. How could we do after one year warranty period?
We also can do service for you, b
Send Inquiry to This Supplier
You May Also Like
-
Woodworking Saw Precision Panel SawUS$ 1900 - 1900MOQ: 1 Piece
-
Costa Rica Aluminum Alloy Profile Transparent Pvc Tent Window MachineryUS$ 7,500 - 8,000MOQ: 1 Set
-
8 in Woodworking Micron Table SawUS$ 60 - 75MOQ: 1 Piece
-
Muliti-function Sandwich Panel Cutting MachineUS$ 1,000 - 50,000MOQ: 1 Set
-
14 "From Factory Wood Cutting Bandsaw MJ14NegotiableMOQ: 1 Piece
-
Electric / Gasoline / Diesel Engine Powered Wood SawmillNegotiableMOQ: 5 Units
-
Small Jigsaw MachineUS$ 200 - 200MOQ: 1 Set
-
Edge Trimmer MX5115A , Forestry Wooden Edge TrimmerNegotiableMOQ: 1 Piece
-
Saw BenchNegotiableMOQ: 1 Unit
-
High Quality Band Saw MachineUS$ 1,666 - 7,999MOQ: 1 Set