Home > Products > Grouting plug grouting pipe grouting pump for hydraulic geology > 48mm sleeve valve pipe 76mm split grouting pipe of subway tunnel 4m, one engineering sleeve valve pipe
48mm sleeve valve pipe 76mm split grouting pipe of subway tunnel 4m, one engineering sleeve valve pipe
- 10000 Piece / Pieces per Month
- Tianjin prot
- 3 days
You May Like
-
Grouting sleeve valve pipe for subway tunnel construction
-
Grouting pipe/repetitive grouting pipe/tunnel embedded grouting pipe/maintainable repetitive grouting pipe
-
8 * 20mm 8 * 24mm repeatable grouting pipe can maintain full section grouting pipe
-
Secondary grouting pipe Spring skeleton grouting pipe PVC grouting pipe 8 * 12 one-time grouting pipe
-
Bridge and highway grouting pipe pvc hose full section repeatable embedded maintainable spring skeleton grouting pipe
-
Construction cold joint PVC plastic rubber inner core embedded repetitive grouting pipe accessories
Product Details
Brand Name | BIAOHUI | Place of Origin | China | |
Model Number | complete | Material | pvc | |
Length | 4m | Thickness | 3mm,4mm | |
Color | blue | Specification | 48mm 76mm | |
Standard | national standard | Outer Diameter | 48mm,50mm,76mm | |
Linear Expansion Coefficient | / | Heat Conductivity | / |
Product Description
Sleeve valve pipe is used for reinforcement and grouting of soft foundation, loose soil and holding tunnel. It is applicable to dam, expressway, subway, tunnel and other projects.
Construction process:
(1) Surveying and setting out: calculate the coordinate position of the pilot hole according to the coordinates of the arranged control points, set out the hole position with a total station, measure the ground elevation with a level gauge, and determine the depth of the pilot hole
(2) Drilling: the casing wall protection water flushing method shall be adopted for drilling and the drilling depth shall reach the grouting consolidation section. Records shall be made during drilling to provide reference data for grouting operation.
(3) Lower pipe: firstly, connect the sleeve valve pipe according to the depth of the pilot hole. The upper opening of the sleeve valve pipe is 20cm above the ground. Seal the lower opening of the sleeve valve pipe with a sharp bottom; Then, lower the sleeve valve tube into the hole, and ensure that the sleeve valve tube is lowered to the bottom of the hole.
(4) Hole washing: clean the hole with high-pressure water to reduce the proportion of sediment and mud in the hole;
(5) Sealing: the distance from the ground around the orifice to 1m below the ground shall be sealed with quick setting cement mortar to prevent the occurrence of grout bleeding during grouting. one
(6) Grouting: sectional grouting is adopted, and the grouting length of each section becomes the grouting step. The length of open steel pipe is the grouting step length.
The grouting step is generally 0.6~1m, which can effectively reduce the influence of stratum heterogeneity on the grouting effect. For sand layer, the grouting step distance should be low; For pebble or broken rock stratum, the grouting step distance should be high. During grouting, after each section of grouting is completed, the length of core pipe shall be moved up or down for one step. Lifting equipment should be used for moving, or 2 pipe tongs should be used to clamp the core pipe symmetrically manually, and both sides should use uniform force at the same time to move the core pipe. A section of grouting core pipe shall be removed every 3~4m grouting length. After grouting, the upper opening of the grouting pipe shall be covered to facilitate the re grouting construction.
Compared with the traditional anchoring process:
1. The hollow design enables the anchor rod to realize the function of grouting pipe and avoid the mortar loss caused by pulling out the grouting pipe in traditional construction technology.
2. The grouting is full, and the pressure grouting can be realized, which improves the project quality.
3. Due to the role of various accessories, the rod body is well centered. Mortar can wrap the whole length of the anchor rod, avoiding the risk of corrosion, and achieving the purpose of long-term support.
Sleeve valve grouting hole spacing is 2.0m × 2.0 m quincunx layout; The sleeve valve tube has the same length as the hole height, and the casing material is poured to the top of the hole. The bottom of the soil cave may be connected with the karst cave, which is easily affected by groundwater. In order to avoid groundwater diluting or taking away the grout, a certain amount of accelerator shall be added or "intermittent quantitative sequential grouting method" shall be used for grouting at the bottom of the cave. The sequence is hole jumping grouting, with the quantitative grouting volume of 5.0m3 for each hole and the interval time of 12h.
PVC sleeve valve pipe
Type: PVC
Working pressure: 1-10 (Mpa)
Product length: 4m (1, 2, 3m can be customized)
Outer diameter: 48mm
Inner diameter: 42mm
Wall thickness: 3mm
Product application: overall or local reinforcement of soft soil foundation
Hole cleaning: after the drilling is completed, the hole shall be cleaned, that is, the thick mud in the hole shall be replaced with thin mud. When the proportion of returned mud is less than 1.1, the hole cleaning can be completed. After hole cleaning, immediately inject casing material into the hole. Casting casing material: casing material is made by mixing cement and clay slurry in proportion (cement: clay: water: 1:1.5~1.53:1.9). Lower the tremie to 10cm from the hole bottom, and use the grouting pump to send the casing material to the hole bottom through the tremie, so that the casing material can completely replace the mud in the hole from bottom to top, until the casing material overflows from the orifice. The casting of casing materials must be carried out continuously without intermission. The time for pouring casing materials shall be as short as possible, and the time shall not exceed 20 minutes.
Contact Us
- Hebei Biaohui Rubber and Plastic Products Co., Ltd
- Contact nameLiu cong Chat Now
- AddressJingxian Rubber and Plastic Base, Hengshui, Hebei
Product Categories
New Products
-
Hot melt gasket Hot melt PVC hot melt gasket Wire mesh gasket for tunnel
-
Repeatable grouting pipe, maintainable grouting (JK-D) multiple grouting pipe
-
Vacuum rubber pipe for vacuum equipment
-
White rubber vacuum rubber tube
-
Vacuum rubber tube/vacuum rubber tube/pure rubber tube
-
Large diameter delivery hose of water pump Large diameter water delivery hose Large diameter drainage hose
-
Large diameter flange water pipe vulcanized flange type steel wire skeleton rubber hose
-
https://fanyi.baidu.com/translate#zh/en/%E5%A4%A7%E5%8F%A3%E5%BE%84%E9%92%A2%E4%B8%9D%E6%B3%A2%E7%BA%B9%E5%90%B8%E6%8E%92%E6%A9%A1%E8%83%B6%E7%AE%A1:~:text=Large%20diameter%20corrugated%20steel%20wire%20suction%20and%20discharge%20rubber%20pipe
-
High pressure drainage hose for mining
-
Large diameter rubber hose suction pump suction and discharge rubber hose flange rubber hose
-
Large diameter flange connected water pump suction and drainage rubber pipe, large diameter steel wire rubber pipe
-
High pressure rubber steel wire pipe suction and drainage hose for transporting sediment and mud
-
Steel wire framed rubber pipe Large diameter rubber pipe for sand suction and mud discharge
-
Rubber hose for sewage suction and drainage Steel wire frame rubber hose for sand pumping of marine cement slurry Large diameter rubber hose
-
Steel wire framed rubber pipe for sewage discharge treatment in engineering plants and mines
-
Large diameter steel wire hose flood control and drought relief dredging water hose large diameter suction and drainage hose
-
Casing grouting pipe,Grouting reinforcement of soft soil foundation with casing grouting pipe
-
PVC sleeve valve pipe,48mm/50mm/76mm/60mm
-
PVC Manchettes tubes,Grouter for foundation reinforcement
-
Sand pumping rubber pipe of sand pumping ship
-
Sand suction hose Sand suction hose Sand conveying hose Manufacturer
-
8 "10" sand pumping steel wire rubber pipe black corrugated sand suction and discharge rubber hose
-
Sand pumping pipe of sand dredger
-
Large diameter hose for pumping river sand
Popular Searches
- Drill Bit
- Steel Pipe
- anchor bolt
- Carbon Steel Pipe
- Drilling Tool
- concrete pipe
- Seamless Steel Pipe
- drill pipe
- Seamless Carbon Steel Pipe
- soil nail
- rock anchor
- rock bolt
- tunnel support
- hollow anchor bolt
- hollow bolt
- mining support
- hollow anchor
- Anchor Bolt Pipe
- roof support
- mining support bolt
- Injection Pipe
- self drilling bolt
- Drilling Grouting Pipe
- Geological Pipe
Recommended Products
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 2228
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 1722
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 1115
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 1014
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 0912
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 5163(63x6)
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 4150(50x4.5)
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 3240(40x4.0)
- IFAN Factory Price Multilayer Pipe Pex Al Pex Pipe 3340(40x3.5)
- clear wire reinforced hose
- tpu polyurethane hose
Find Similar Products By Category
- Rubber & Plastics > Plastic Products > Composite Pipes
- Please Enter your Email Address
- Please enter the content for your inquiry.
We will find the most reliable suppliers for you according to your description.
Send Now-
Liu cong
Welcome to my shop, I'm glad to serve you. Please feel free to send me any questions you may have.
Your message has exceeded the limit.
- Contact supplier for lowest price
- Customized Request
- Request Sample
- Request Free Catalogs
Your message has exceeded the limit.
-
Purchase Quantity
-
*Sourcing Details
Your inquiry content must be between 10 to 5000 characters.
-
*Email
Please enter Your valid email address.
-
Mobile